Our Work
01
Fremont, CA
Cost: $29,500
Time Frame: 5 Weeks
This project involves a full bathroom remodel, including the addition of a wall-mount toilet, redesigning the bathroom layout, converting one half bathroom into a full bath with a closet layout change to accommodate it, and installing a new curb shower.
02
Fremont, CA
Cost: $24,000
Time Frame: 4 Weeks
This project involves a full bathroom remodel, including layout changes and installation of a wall-hung toilet.
03
Newark, CA
Cost: $26,000
Time Frame: 4 Weeks
The master bathroom remodel entails new drywall installation, addition of a towel warmer, upgraded plumbing, installation of a curb shower, and custom glass for the shower enclosure.
04
Union City, CA
Cost: $23,000
Time Frame: 4 Weeks
The guest bathroom remodel includes all new drywall, upgraded plumbing, installation of a towel warmer, subfloor repair, custom shower glass, addition of a new barn door, and installation of a curb shower.
05
Union City, CA
Cost: $40,000
Time Frame: 4 Weeks
This project focuses on remodeling the master bathroom, keeping the existing layout unchanged, but incorporating a curb shower and enlarging the existing shower area, along with the installation of floating shelves.