01

Fremont, CA

Cost: $29,500

Time Frame: 5 Weeks

This project involves a full bathroom remodel, including the addition of a wall-mount toilet, redesigning the bathroom layout, converting one half bathroom into a full bath with a closet layout change to accommodate it, and installing a new curb shower.

02

Fremont, CA

Cost: $24,000

Time Frame: 4 Weeks

This project involves a full bathroom remodel, including layout changes and installation of a wall-hung toilet.

2046c5e6-a9cb-4f49-ac5a-6401bba6a73f.jpg
24-web-or-mls-DSC00554 (1).jpg

03

Newark, CA

Cost: $26,000

Time Frame: 4 Weeks

The master bathroom remodel entails new drywall installation, addition of a towel warmer, upgraded plumbing, installation of a curb shower, and custom glass for the shower enclosure.

04

Union City, CA

Cost: $23,000

Time Frame: 4 Weeks

The guest bathroom remodel includes all new drywall, upgraded plumbing, installation of a towel warmer, subfloor repair, custom shower glass, addition of a new barn door, and installation of a curb shower.

79d47878-4579-46fc-ae06-f2b5d011d27d.jpg
dbe31ea7-56f6-4e84-9f8d-23eb11efec23.jpg

05

Union City, CA

Cost: $40,000

Time Frame: 4 Weeks

This project focuses on remodeling the master bathroom, keeping the existing layout unchanged, but incorporating a curb shower and enlarging the existing shower area, along with the installation of floating shelves.